BELGIUM
myAltimate
Tel: +32 2 370.39.11

ALTIMATE - SMART IT DISTRIBUTOR

F5

Winning With BIG-IP WAN Optimization Manager v11

F5 Product News - 22/12/2011

With the launch of a series of new packaging options for WAN Optimization Manager (WOM) in BIG-IP v11.0, now is the time to discuss with your customers what F5's WAN optimisation solutions can do for them. Consider these key drivers and opportunities:

  • Continued high throughput data replication requirements
  • Microsoft Exchange 2010 momentum in 2012
  • Flexible and cost effective WAN optimisation for virtualised data centres and cloud
Look for customers who need data replication of large datasets: Exchange 2010 Database Availability Group (DAG), NetApp SnapMirror, Dell EqualLogic, Oracle Database, or Long Distance vMotion.

 BE F5

 Several new features and enhancements have been added in WOM v11.0:

  • Performance
         o Hardware compression enhancements
         o Symmetric adaptive compression
         o Single connection compression improvement
         o Packet loss improvements
         o High throughput for DC-DC replication
         o Solid State Drive support on BIG-IP 11000
  • Useability and security
         o Automatic subnet discovery
         o Disk management and provisioning enhancement
         o WAN optimisation over IPSec
         o IPv6 support  
With the choice of both physical and virtual standalones as well as integrated ADC solutions, we now offer even more flexible deployment options:
 
        1. Standalones (WOM only, Hardware or Virtual Edition)
        2. Add-on modules (WOM on LTM)
        3. ADC bundles (LTM + WOM)
        4. Access bundles (APM + WAM + WOM)

be f51

 

For more information: